Module 1/5 · Weeks 1–3 · 30 h

Integration planning

DRT 332 UAS Installation and System Integration

The lesson for this module is being written. Use the knowledge units below in the meantime.

Online (before class)

Study the assigned knowledge units in advance, review media and take the module quiz

In class / field

Lab or field practice from worksheets with a safety checklist

Learning evidence: Checked worksheets and quiz results

Module quiz

The quiz for this module is being prepared

Knowledge domain: Aircraft, structures and design · Installation, maintenance and testing · Electrical, electronics and power systems · Management, innovation and professional practice